Document Number:
2002STATE032990 Channel: n/a
PRINTABLE VERSION
PAGE 01
STATE 032990 202202Z
ORIGIN INL-0O
DRAFTED BY: INL/A:
RETHERIDGE -- 02/20/2002 202-776-8806
APPROVED BY: INL: RBEERS
INL: JMACK
INL/RM: GRECACH INAS
INL/LP: AMATANO
R 202154Z FEB 02
FM SECSTATE
WASHDC
TO AMEMBASSY BOGOTA
AMEMBASSY LA PAZ
AMEMBASSY LIMA
INFO DOS AIR
WING PATRICK AFB FL
FOR NAS
E.O. 12958: N/A
TAGS: SNAR, BL,
CO, PE
SUBJECT:
FUNDING FOR INL AVIATION PROGRAMS
REF:
A. LA PAZ 121
B. STATE 16912
1. THIS IS AN
ACTION REQUEST MESSAGE. SEE PARAGRAPH 9.
2. THE
RECENTLY ENACTED FY 2002 BUDGET PROVIDES SIXTY MILLION DOLLARS FOR THE INL/A
AVIATION PROGRAM. WHILE THIS REPRESENTS AN INCREASE OVER THE PREVIOUS YEAR’S
BUDGET, IT WILL NOT MEET ALL OF THE AVIATION REQUIREMENTS CONVEYED BY POSTS
AND/OR DIRECTED BY CONGRESS. BY DESIGN, MUCH OF THE FY 2002 AVIATION SUPPORT
FUNDING IS CONTAINED IN ELEMENTS OF THE ANDEAN COUNTERDRUG INITIATIVE THAT
WILL BE ALLOTTED TO POSTS.
INL/A WILL
THEREFORE NEED TO COLLABORATE WITH RESPECTIVE NARCOTICS AFFAIRS SECTIONS TO
IDENTIFY FUND SOURCES FOR THE VARIOUS AVIATION REQUIREMENTS AND ENSURE
UNINTERRUPTED OPERATIONS. THIS CABLE INFORMS POSTS OF FUNDING REQUIREMENTS
THAT INL/A SEEKS TO ADDRESS USING COUNTRY PROGRAM FUNDING ASSISTANCE AND
REQUESTS COMMITMENTS FROM EACH NAS. WE BELIEVE THAT POSTS HAVE ALREADY
ANTICIPATED AND TAKEN INTO CONSIDERATION MANY OF THESE FUNDING REQUIREMENTS
IN DEVELOPING THEIR FY 2002 BUDGET PLANS. HOWEVER, SOME OF THE FUNDING
ASSISTANCE REQUESTED RESULTS FROM RECENT EVENTS THAT COULD NOT BE
ANTICIPATED. AFTER RECEIVING RESPONSES TO THIS MESSAGE, INL/A WILL ASSESS
ITS FUNDING POSTURE AND SEEK INL GUIDANCE/ASSISTANCE ON ANY SHORTFALLS THAT
WE HAVE NOT BEEN ABLE TO ADDRESS COLLECTIVELY.
3. INL/A HAS
RECEIVED A SIXTY MILLION DOLLAR BUDGET FOR FY 2002 BUT THE COST OF
SATISFYING STEADY STATE AVIATION SUPPORT REQUIREMENTS THAT IT IS CHARGED
WITH FAR EXCEEDS THAT AMOUNT. THE COST OF MEETING INL/POST AVIATION
REQUIREMENTS IS THE SUM OF THE CURRENT NEGOTIATED CONTRACT COST AS OF THE
LATEST DEFINITIZED MODIFICATION, THE COST OF SEVERAL PENDING CONTRACT
ACTIONS THAT MUST BE ADDED, AND VARIOUS NON-CONTRACT COSTS SUCH AS SALARIES,
TRAVEL, PATRICK AIR FORCE BASE SUPPORT, AND DOD-SOURCE AIRCRAFT REPAIR PARTS
COSTS. INL/A HAS ANALYZED THESE REQUIREMENTS, MATCHED ALL OF ITS AVAILABLE
SIXTY MILLION DOLLAR BUDGET AGAINST THEM IN PRIORITY ORDER, AND IDENTIFIED
THE UNFUNDED REQUIREMENTS IT MUST OBTAIN FINANCIAL ASSISTANCE FOR (OR RELIEF
FROM).
4. UP UNTIL
THIS POINT, ALTHOUGH INL/A HAS BEEN AWARE THAT REQUIREMENTS WOULD EXCEED ITS
OWN BUDGET CAPABILITY, IT HAS NOT SOUGHT OUTSIDE FUNDING ASSISTANCE. THIS IS
BECAUSE OF THE "CONTINUING RESOLUTION" STATUS THAT HAS EXISTED UNTIL
RECENTLY, AND THE REQUIREMENT TO MEET ADDITIONAL NOTIFICATION AND
CERTIFICATION ACTIONS BEFORE FY 2002 FUNDS CAN BE AVAILABLE. ACCORDINGLY,
INL/A HAS BEEN FUNDING ITS CONTRACT INCREMENTALLY AT A REDUCED LEVEL. ONE
RESULT THAT THE UNDERFUNDING OF THE CONTRACT HAS HAD IS THAT MATERIAL
PURCHASES HAVE HAD TO BE STRICTLY CURTAILED, THEREFORE REDUCING THE STOCKAGE
OF PARTS AND COMPONENTS BELOW REQUIRED LEVELS. INL/A IS CURRENTLY ORDERING
ONLY THOSE REPAIR PARTS THAT GROUND AIRCRAFT, AND IS NOT ORDERING PARTS FOR
MORE ROUTINE MAINTENANCE REQUIREMENTS OR THE REPLENISHMENT OF STOCKS. THIS
DEPLETION OF STOCKS, IF NOT REVERSED, WILL ADVERSELY IMPACT AIRCRAFT
OPERATIONAL READINESS RATES AND FUTURE POST-DIRECTED MISSIONS.
5. THE
SPECIFIC PROJECTS THAT CANNOT BE FUNDED WITHIN THE SIXTY MILLION DOLLAR AIR
WING BUDGET WILL BE DETAILED IN THE PARAGRAPHS THAT FOLLOW, BUT THERE ARE
SEVERAL DEVELOPMENTS THAT HAVE INCREASED AIR WING COSTS. FOR EXAMPLE, THE
ENTIRE UH-1H FLEET REQUIRES REPAIRS ASSOCIATED WITH THE PROBLEMATIC, AGING
T-53-L13-B ENGINE WHICH HAS BEEN THE SUBJECT OF MANY GROUNDING MESSAGES AND
WHICH RECEIVES LITTLE SUPPORT FROM THE DOD SYSTEM DUE TO PLANNED PHASEOUT/OBSOLESCENCE.
THERE IS LITTLE ROOM TO FURTHER DEFER THESE ENGINE REPAIRS WITHOUT
JEOPARDIZING SAFETY AND RELIABLE MISSION PERFORMANCE, SO WE MUST DO HALF OF
THESE REPAIRS THIS YEAR AND HALF THE FOLLOWING YEAR. WE ALSO MUST ACCOMPLISH
TWENTY OV-10D PROPELLER OVERHAULS. THERE ARE ALSO MANY EXPANDED ACTIVITIES
DIRECTLY ASSOCIATED WITH PLAN COLOMBIA THAT ARE NOT FUNDED WITHIN THE AIR
WING BUDGET (COLOMBIA MULTI-SPECTRAL IMAGING SYSTEM, FOR EXAMPLE). ANOTHER
MAJOR FACTOR IS A ONE HUNDRED AND FIFTY PERCENT INCREASE IN DEFENSE BASE ACT
(DBA) INSURANCE COSTS (ASSOCIATED DIRECTLY WITH CONTRACTOR PERSONNEL SERVING
OVERSEAS) WHICH AMOUNTS TO ALMOST FOUR MILLION DOLLARS WHICH WAS AN
UNANTICIPATED DIRECT RESULT OF RISK/RATE ADJUSTMENTS FOLLOWING THE SEPTEMBER
ELEVENTH TERRORIST ATTACKS. THESE SITUATIONS, ALONG WITH OTHERS, COMBINE TO
PRESENT A SERIOUS SHORTFALL. INL/A SEEKS ASSISTANCE FROM COUNTRY PROGRAMS
THAT ARE CUSTOMERS OF AIR WING SERVICES TO MAKE UP THE BUDGET GAP AS MUCH AS
POSSIBLE. THE FOLLOWING PARAGRAPHS PROVIDE ADDITIONAL DETAILS AS THEY
PERTAIN TO SPECIFIC COUNTRY PROGRAMS.
FUNDING
ASSISTANCE REQUESTED FROM NAS BOGOTA
6. INL/A
REQUESTS COLOMBIA COUNTRY PROGRAM FUNDING SUPPORT FOR THE FOLLOWING ITEMS
(SOME OF WHICH ARE COMPONENTS OF THE COLOMBIA
SEGMENT OP THE ACI) THROUGH THE END OF FY 2002:
A. CONTINUED
FUNDING OF ONE OF TWO C-27 AIRPLANES STATIONED IN COLOMBIA, PER PREVIOUS
AGREEMENT. ESTIMATED COST FOR THE REMAINDER OF FY 2002 IN ADDITION TO
FUNDING ALREADY PROVIDED THROUGH NOVEMBER 2001: $1.8M.
B. OV-10
PROPELLER OVERHAUL COSTS: $l.3M.
C. (OPTIONAL):
ACQUISITION OF THE NINTH AIR TRACTOR AT-802 SPRAY PLANE. (NOTE: FY 2000
EMERGENCY SUPPLEMENTAL AND REPROGRAMMED FY 1999 EMERGENCY SUPPLEMENTAL FUNDS
WERE SUFFICIENT TO PROCURE ONLY EIGHT OF NINE PLANNED PLANES). COST FOR THE
NINTH PLANE, LESS AVAILABLE REMAINING EMERGENCY SUPPLEMENTAL FUNDS, WOULD BE
$1.4M.
D. OPERATIONS
AND MAINTENANCE COSTS FOR "ADDITIONAL SPRAY AIRCRAFT" (FOUR OV-1OD AND NINE
AT-802) FOR REMAINDER OF FY 2002 THAT CANNOT BE COVERED BY REMAINING FY 2000
EMERGENCY SUPPLEMENTAL FUNDS: $9.2M ($6.2M FOR OV-10, AND $3M FOR LATE FY
AT-802 COSTS).
E. SPRAY PILOT
TRAINING (IN ADDITION TO THE $2M PREVIOUSLY PROVIDED) FOR THE REMAINDER OF
FY 2002: $l.5M.
F. COLAR UH-1N
CONTRACT COSTS FOR REMAINDER OF FY 2002 THAT CANNOT BE COVERED BY REMAINING
FY 2000 EMERGENCY SUPPLEMENTAL FUNDS: $21.7M.
G. COLAR UH-1N
DOD PARTS REQUISITION COSTS (THROUGH FORT STEWART SUPPORT AGREEMENT): $1.4M.
H. COLAR
HUEY-II CONTRACT COSTS FOR REMAINDER OF FY 2002 THAT CANNOT BE COVERED BY
REMAINING FY 2000 EMERGENCY SUPPLEMENTAL FUNDS: $lO.7M.
I. COLAR HUEY-
II DOD PARTS REQUISITION COSTS (THROUGH FORT STEWART SUPPORT AGREEMENT):
$0.6M.
J. EQUITABLE
ADJUSTMENT FOR MULTI-SPECTRAL IMAGING SYSTEM (MDIS) CAMERA REQUIREMENTS:
$l.3M.
K. INCREASE IN
DBA INSURANCE: $3.4M.
L. OTHER
CONTRACT COST INCREASES ASSOCIATED WITH PLAN COLOMBIA: $6.48M.
M. TOTAL:
$60.78M INCLUDING OPTIONAL NINTH AT-802. (NOTE: THIS AMOUNT INCLUDES NO/NO
UH-60 RELATED COSTS SINCE THERE IS CURRENTLY NO INL/A BUDGET/CONTRACT
CONNECTION WITH THAT PROJECT. ALSO, IT DOES NOT INCLUDE SEPARATE DYNCORP
TASK ORDER ARRANGEMENTS WITH POST WHICH CONTINUE TO BE NAS-FUNDED).
FUNDING
ASSISTANCE REQUESTED FROM NAS LA PAZ
7. INL/A
REQUESTS BOLIVIA COUNTRY PROGRAM FUNDING SUPPORT FOR THE FOLLOWING ITEMS
THROUGH THE END OF FY 2002:
A. CONTINUED
FIXED WING SUPPORT COST REIMBURSEMENT PER PREVIOUS AGREEMENT, IN ACCORDANCE
WITH FLYING HOUR LEVELS STATED IN REF A: $0.7M FOR FY 2002.
B. FUNDING TO
ADDRESS APPROXIMATELY HALF OF THE ENGINE AND TAIL BOOM PROBLEMS ON POST’S
UH-1H FLEET: BEGINNING IN THE YEAR 2004, THERE WILL BE NO DOD SUPPORT OF THE
UH-1H HELICOPTER. INL/A HAS PLANS TO BRING MAJOR COMPONENTS OF THE UH-1H
INTO COMPLIANCE WITH ORIGINAL EQUIPMENT MANUFACTURER SPECIFICATIONS BY THAT
TIME IN ORDER TO PRECLUDE GROUNDING OF AIRCRAFT. ENGINES AND TAIL BOOMS ARE
THE PRIMARY ISSUE.
DURING FY
2002 WE MUST REPAIR HALF OF THE TAIL BOOMS TO AVOID FREQUENT RECURRING X-RAY
INSPECTIONS AND ALSO MUST UPGRADE NINE ENGINES (INCLUDING SPARES) TO MEET
COMMERCIAL SPECIFICATIONS. THESE ARE THE MINIMUM REPAIRS REQUIRED. WE PREFER
TO GO BEYOND THAT ON AS MANY AIRFRAMES AS POSSIBLE BY MODIFYING THEM TO FULL
HUEY-II CONFIGURATION. WE UNDERSTAND POST ALREADY HAS PLANS TO FUND SOME
NUMBER OF THESE MODIFICATIONS. WITH THE FULL HUEY-II UPGRADE, POST RECEIVES
AN AIRCRAFT THAT HAS BETTER LIFT, REQUIRES FEWER MAINTENANCE MANHOURS, HAS
MORE TIME BETWEEN OVERHAULS, AND IS FRESHLY REFURBISHED. THE EXTENT OF
REPAIR OR MODIFICATION IS UP TO POST, BASED ON FUNDING ABILITY AND
PREFERENCE. WE SEEK THE REPAIR OF NINE UNITS. UNIT COST IS $0.32M FOR BASIC
REPAIRS OR $2.0M FOR THE HUEY-II MODIFICATION. WE ARE THEREFORE REQUESTING
BETWEEN $2.9M AND $18M, DEPENDING ON POST’S PREFERRED MIX. (NOTE: THIS
ESTIMATE ASSUMES NO GROWTH IN THE BOLIVIA HUEY FLEET. IF POST ENVISIONS THAT
HUEY-II HELICOPTERS WOULD AUGMENT, RATHER THAN REPLACE, EXISTING UH-1H
HELICOPTERS, THE FUNDING REQUIRED WOULD BE GREATER).
C. INCREASE IN
DBA INSURANCE: $0.2M
D. TOTAL:
BETWEEN $3.SM AND $18.9M, DEPENDING UN POST‘S PREFERENCES ON UH-1H
REPAIR/MODIFICATION. (NOTE: THIS DOES NOT INCLUDE SEPARATE DYNCORP TASK
ORDER ARRANGEMENTS WITH POST WHICH CONTINUE TO BE NAS-FUNDED).
FUNDING ASSISTANCE REQUESTED FROM NAS LIMA
8. INL/A
REQUESTS PERU COUNTRY PROGRAM FUNDING SUPPORT FOR THE FOLLOWING ITEMS
THROUGH THE END OF FY 2002:
A. CONTINUED
C-27 FIXED WING SUPPORT COST REIMBURSEMENT PER PREVIOUS AGREEMENT: $1.9M.
B. FUNDING TO
ADDRESS APPROXIMATELY HALF OF THE ENGINE AND TAIL BOOM PROBLEMS ON POST’S
UH-1H FLEET: THERE WILL BE NO DOD SUPPORT TO THE UH-1H HELICOPTER BEGINNING
IN THE YEAR 2004. INL/A HAS PLANS TO BRING MAJOR COMPONENTS OF THE UH-1H
INTO COMPLIANCE WITH ORIGINAL EQUIPMENT MANUFACTURER SPECIFICATIONS BY THAT
TIME IN ORDER TO PRECLUDE GROUNDING OF AIRCRAFT. ENGINES AND TAIL BOOMS ARE
THE PRIMARY ISSUE.
DURING FY
2002 WE MUST REPAIR HALF OF THE TAIL BOOMS TO AVOID FREQUENT RECURRING X-RAY
INSPECTIONS AND ALSO MUST UPGRADE NINE ENGINES (INCLUDING SPARES) TO MEET
COMMERCIAL SPECIFICATIONS. THESE ARE THE MINIMUM REPAIRS REQUIRED. WE PREFER
TO GO BEYOND THAT ON AS MANY AIRFRAMES AS POSSIBLE BY MODIFYING THEM TO FULL
HUEY-II CONFIGURATION. WE UNDERSTAND POST ALREADY HAS PLANS TO FUND SOME
NUMBER OF THESE MODIFICATIONS. WITH THE FULL HUEY-II UPGRADE, POST RECEIVES
AN AIRCRAFT THAT HAS BETTER LIFT, REQUIRES FEWER MAINTENANCE MANHOURS, HAS
MORE TIME BETWEEN OVERHAULS, AND IS FRESHLY REFURBISHED. THE EXTENT OF
REPAIR OR MODIFICATION IS UP TO POST, BASED ON FUNDING ABILITY AND
PREFERENCE. WE SEEK THE REPAIR OF NINE UNITS. UNIT COST IS $0.32M FOR BASIC
REPAIRSOR $2.0M FOR THE HUEY-II MODIFICATION. WE ARE THEREFORE REQUESTING
BETWEEN $2.9M AND $18M, DEPENDING ON POST’SPREFERRED MIX. (NOTE: THIS
ESTIMATE ASSUMES NO GROWTH IN THE PERU HUEY FLEET. IF POST ENVISIONS THAT
HUEY-II HELICOPTERS WOULD AUGMENT, RATHER THAN REPLACE, EXISTING UH-1H’S
HELICOPTERS, THE FUNDING REQUIRED WOULD BE GREATER).
C. INCREASE IN
DBA INSURANCE: $0.2M
D. FUNDING FOR
INITIAL PARTS STOCKAGE AND CONTRACT SUPPORT FOR ADDITIONAL C-208 RECENTLY
ACQUIRED BY NAS (SEE REF B): $O.7M.
E. TOTAL:
BETWEEN $5.7M AND $20.8M, DEPENDING ON POST’S PREFERENCES ON UH-1H
REPAIR/MODIFICATION. (NOTE: THIS DOES NOT INCLUDE SEPARATE DYNCORP TASK
ORDER ARRANGEMENTS WITH POST WHICH CONTINUE TO BE NAS-FUNDED; IT ALSO DOES
NOT INCLUDE K-MAX REQUIREMENTS, FOR WHICH ADEQUATE FUNDING REMAINS FROM THE
FY 2000 EMERGENCY SUPPLEMENTAL APPROPRIATION).
ACTION
REQUESTED
9. IN ORDER TO
FACILITATE TIMELY ACTIONS WITH RESPECT TO THE DYNCORP CONTRACT AND HUEY-II
PRODUCTION ACTIVITIES, INL REQUESTS THAT POSTS PROVIDE THE FOLLOWING
INFORMATION NO LATER THAN MARCH 8, 2002:
A. ABILITY AND
WILLINGNESS OF NAS TO PROVIDE FUNDING AS REQUESTED IN RELATED PARAGRAPHS
FOUR THROUGH SIX ABOVE. (LA PAZ AND LIMA, PLEASE SPECIFY POST PLANS WITH
REGARD TO HUEY-II MODIFICATIONS THAT IT WILL FUND, AND THE EXTENT TO WHICH
SUCH MODIFIED AIRCRAFT WILL REPLACE, RATHER THAN AUGMENT, EXISTING
AIRFRAMES).
B. (TO THE
EXTENT POSTS ARE UNABLE TO PROVIDE THE FULL AMOUNT REQUESTED)
NAS RECOMMENDATIONS ON
WORK REQUIREMENT REDUCTIONS THAT CAN BE MADE IN ORDER TO REDUCE FUNDING
SHORTFALLS.
10. INL/A POC
IS BOB ETHERIDGE, (202) 776-8806. POWELL
<< END OF
DOCUMENT >>
|